Restoration work of penstock for 65 MW Kashang Hydro Electric Power Project.
Client :M/s Himachal Pradesh Power Corporation Ltd.
Location :Kinnaur, Himachal Pradesh
Status :Completed in 2021
Scope of Work :
- Inspection and repairs of inclined Pressure Shaft and recommissioning of Project.
- Timely completion of the works well within stipulated time from client.
- The entire work was executed technically and in a systematic manner to the satisfaction and appreciation of esteemed client.
Penstock repair and leakage rectification at 16 MW Patikari Hydro Electric Power Project.
Client :M/s Patikari Power Pvt. Ltd.
Location :Mandi, Himachal Pradesh
Status : Completed in 2021
Scope of Work :
- Preparing approach and scaffolding works and making special arrangements for accessing the area of leakage.
- Rectification of leakage by replacing the seals
Online repair of leakage in manhole of Penstock of Generating Unit at 1200 MW Teesta-III Hydro Electric Power Project , Sikkim
Client :M/s Aquagreen Engineering Management Pvt. Ltd.
Location :Mangan, Sikkim
Status :Completed in 2020
Scope of Work :
- The leakage was arrested without shutdown of the plant and power being generated continuously which would have otherwise resulted in revenue loss to the tune of Rs 10 Cr.
- This technique is typical to chemical process plants, water supply lines and steam boiler lines. Our team of professionals successfully implemented the technique in a Hydro Power Plant leading to prevention of loss to the client.
Restoration of Electro-Mechanical equipment including testing and precommissioning of 2x2.5 MW Sainj Powerhouse, post flooding
Client :M/s Himshakti Power Pvt. Ltd.
Location :Sainj, Hiamchal Pradesh
Status :Completed in 2018
Scope of Work :
- The Power House and associated facilities of the project were completely submerged in silt and mud due to flash flood.
- The critical job for restoration of the facilities like replacement of electrical panels and other damaged or lost equipment.
- Restoration experts were engaged to ensure that the critical equipment is made operational within shortest possible time upto satisfaction of client.